How do you clean under the raised-floor plenum in your data center? Data center expert Robert McFarlane offers tips and best practices for data center maintenance.

It's worse than cleaning out the garage. It's cramped, stuff is piled and tangled everywhere, and what's worse, a lot of it is alive! And like a bunch of snakes, you're afraid that if you touch something, it will bite -- only this "bite" might be an outage that could cost you your job.

But it has to be done. Just try blowing through a tangled mass of limp spaghetti and you'll get some idea of what your air conditioners are facing if you're one of the majority whose under-floor looks like a multi-colored pasta dish. There's a lot of power wasted when fans try to move huge volumes of air through that maze.

But it's worse than that. The air you're paying so much to cool can't get to where it's needed, so much of your expensive cooling capacity is wasted. It makes no difference how many perforated or grate tiles you put in; if the air volumes and pressures can't get to those tiles, it's like throwing a glass of water at a screen door -- what's on the other side isn't going to get very wet. And your equipment isn't going to be cooled very well either.

We know it has to be done, but how to go about it? It can be a daunting task, and there are always so many more important things, aren't there? Actually, there really aren't, because that new high-performance hardware you're anxious to get running is going to fail if you can't cool it, so you should look at the cleanup as just another preparatory step to the new installations.

Like cleaning out the garage, you have to start somewhere. Clear out an easy area. It may be in a place that makes minimal improvement, but that's OK. Like a wise man said, "Every journey begins with a single step." Maybe you already know where abandoned cable is piled, and every cable that's easy to remove will likely make others easier to access...


BROWSE BY TAG
Data center design and infrastructure,   Data center room design and location,   Data center networking,   Network cabling,   Data center cooling,   VIEW ALL TAGS

Digg This!    StumbleUpon Toolbar StumbleUpon    Bookmark with Delicious Del.icio.us    Add to Google



RELATED CONTENT
Data center room design and location
Air-side economizers reduce energy use at NetApp data center
Data center location selection: Incentives can tip scales
Notes from AFCOM Data Center World: Day one
Microsoft cuts ribbon on mega data center
Hot-aisle/cold-aisle containment takes hold
How to identify and remediate data center hot spots
Colo taps cold weather, river for green data center
Preventing particle and gas contamination in the data center
AMD augments six-core Opteron chip line: News in brief
Hot-aisle vs. cold-aisle containment: Liebert and APC face off
Data center room design and location Research

Network cabling
Data center cabling management: Mind over matter
Best practices for data center cabling selection
With Cisco's Nexus 7000 switch, IP and Fibre Channel converge
KVM streamlines remote server management
Cisco, others roll out InfiniBand gear for HPC apps
Is 10 Gigabit Ethernet catching up with InfiniBand?
HP BladeSystem option simplifies server provisioning
Are shielded cables standard in the data center?
How to determine data center cabling requirements
Calculating costs of data center cabling infrastructure

Data center cooling
IT wish list: Better ways to analyze data center environmental metrics
End users still cool on Iceland as a data center site
Air-side economizers reduce energy use at NetApp data center
Sizing computer room air conditioners for data center energy efficiency
Should you comply with Article 645 of the National Electrical Code?
How to identify and remediate data center hot spots
Data center humidity levels source of debate
Air-side and water-side economizers in the data center
Amazon data center facility engineer touts radical cooling tactics
Colo taps cold weather, river for green data center
Data center cooling Research

RELATED GLOSSARY TERMS
Terms from Whatis.com − the technology online dictionary
data center  (SearchDataCenter.com)
Electric plugs for each country  (SearchDataCenter.com)
green data center  (SearchDataCenter.com)
grumble line  (SearchDataCenter.com)
Modular Datacenter  (SearchDataCenter.com)
TIA-942  (SearchDataCenter.com)
tin whiskers  (SearchDataCenter.com)
Uptime data center tier standards  (SearchDataCenter.com)
water cooling  (SearchDataCenter.com)
zinc whiskers  (SearchDataCenter.com)

RELATED RESOURCES
2020software.com, trial software downloads for accounting software, ERP software, CRM software and business software systems
Search Bitpipe.com for the latest white papers and business webcasts
Whatis.com, the online computer dictionary


, or at least identify.

But here comes the challenge: You really shouldn't remove more than two adjacent floor tiles at a time, and you should leave at least four in place before removing the next two. Taking out more can de-stabilize the floor and cause misalignment, which results in leaks and the waste of more of that precious air you're working so hard to preserve. While you're working, lots of air will pour through those open tiles, which can air-starve hardware in other parts of the floor. If you start to get serious overheating somewhere, you may need to limit your work in critical areas to short durations and replace the tiles until things cool down. Just remember, every step you take will make things a little bit better.

This is not a job for one person. Someone else will have to get the "black bean" and be designated to help with this, because wires will need to be wiggled to see where they go, and you will often need to cut them in order to untangle them and pull them out. But before cutting, mark the wires! Colored electrician's tape works well for this: blue for "dead"; red for "critical -- don't disconnect"; yellow for "caution -- need to check further"; and green for "OK to unplug and re-dress." (Look in the electrical department at Home Depot or Lowes.) You may want to do more specific marking while you're at it, but that's up to you.

Then comes the challenging part. Murphy's Law virtually guarantees that the cables you most need to clean up will be mostly marked red. These require a plan, and will also mean some scheduled downtime, but that's a lot better than unplanned outages due to over-temperature failures. Work it out on paper ahead of time. And seriously consider installing an overhead cable tray ("basket-type" so the air goes through) for new cables. You can run and mark wire and glass ahead of time this way, then do an enormous amount of re-connecting during your planned downtime, which will probably be a lot shorter than it would have been.

If you must keep those cables under the floor, you need to be aware of what paths you're trying to keep clear. First is the area in front of any air conditioner. Your cabinets should be arranged in a hot-aisle/cold-aisle configuration (front-to-front and back-to-back), and your air conditioners should be at the ends of the rows, preferably aligned with the hot aisles. But no matter how things are arranged, cables should be run parallel to the air flow. Cables that need to cross the air stream should do so as far from the air conditioners as possible, and should be spread out as flat as is practical. If you use a cable tray (recommended), again, use "basket-type" and keep it relatively high under the floor if you have enough floor depth, and under the hot aisle tiles if the air flow is parallel to the cabinet rows.

While you're under that floor, make good use of a vacuum -- preferably one with a Hepa Filter so fine dirt doesn't just blow back into the room, as can happen with a standard shop vac.

We haven't mentioned the old piping that many people still have left over from those ancient water-cooled mainframes. If you're still in one of these legacy computer rooms, you probably have a punch card full of other problems, like a raised floor that's 12-inches or less in height and air conditioners added wherever they would fit. This makes cleanout even more important, because there's not much room for air flow in the first place, and air paths are probably not what they should be either.

Good luck with this project. After this, cleaning out the garage may seem easy! But the potential for improved cooling and energy savings in this case is enormous.

ABOUT THE AUTHOR: Robert McFarlane has spent more than 30 years in communications consulting, with experience in every segment of the industry. McFarlane was a pioneer in the field of building cabling design and a leading expert on trading floor and data center design. He is currently president of the Interport Financial Division of New York-based Shen Milsom & Wilke Inc. and a data center power expert.

What did you think of this feature? Write to SearchDataCenter.com's Matt Stansberry about your data center concerns at mstansberry@techtarget.com.

Rate this Tip
To rate tips, you must be a member of SearchDataCenter.com.
Register now to start rating these tips. Log in if you are already a member.




DISCLAIMER: Our Tips Exchange is a forum for you to share technical advice and expertise with your peers and to learn from other enterprise IT professionals. TechTarget provides the infrastructure to facilitate this sharing of information. However, we cannot guarantee the accuracy or validity of the material submitted. You agree that your use of the Ask The Expert services and your reliance on any questions, answers, information or other materials received through this Web site is at your own risk.



White Papers - Data Center Networking

The Intel IT Technology Center - Power, Performance and Mobility Solutions

HomeNewsTopicsITKnowledge ExchangeTipsBlogsMultimediaWhite PapersEvents
About Us  |  Contact Us  |  For Advertisers  |  For Business Partners  |  Site Index  |  RSS
SEARCH 
TechTarget provides technology professionals with the information they need to perform their jobs - from developing strategy, to making cost-effective purchase decisions and managing their organizations' technology projects - with its network of technology-specific websites, events and online magazines.

TechTarget Corporate Web Site  |  Media Kits  |  Site Map




All Rights Reserved, Copyright 2005 - 2009, TechTarget | Read our Privacy Policy
  TechTarget - The IT Media ROI Experts