Locating persistent hot spots in the data center


Terry L. Rodgers and Steve Escalante, Contributors
12.27.2006
Rating: -3.82- (out of 5)


Digg This!    StumbleUpon Toolbar StumbleUpon    Bookmark with Delicious Del.icio.us   


The threat of overheating is a chief concern among modern data center operators. The presence of hot spots continues to hamper the efficiency of today's high-density computer equipment.
More on data center cooling:
HP ferrets out data center hot spots

Liquid-cooled refrigerants solve density hot spots

Even though many data center operators believe they have installed the adequate cooling capacity to support their IT infrastructure, they are still witnessing a high number of hot spots, which are defined as areas of elevated temperature at the inlet side of computer equipment. This can typically be attributed to either a lack of cooling capacity or inability to deliver the cooling where it is needed.

So what is the most efficient way to resolve this complex problem and ensure the data center's cooling infrastructure is optimized?

The facility operator or engineer should begin by completing a thorough evaluation and assessment of the data center based upon three primary techniques: load reconciliation, air distribution evaluation, and systems operational assessment.

Any assessment should start with a load reconciliation, which documents the computer equipment within the room and its associated heat load, then benchmarks it against the facility capacity. The primary goal of this first step is to employ a high level of detail within the load analysis to identify where the low-density and high-density loads are located within the data center, and to quantify each.

Several software programs exist that can track the equipment inventory of the data center to aid in this process. Also, most IT hardware providers can provide actual heat load and cooling requirements data specific to the associated IT equipment. This can usually be attained via the IT manufacturer's website by searching for the associated installation manuals. These usually include an "environmental specifications" section and an ASHRAE "Thermal Report".

The next step, air distribution evaluation, determines the air flow characteristics necessary to satisfy the loads for all locations and assesses the air distribution performance in meeting the load requirements. A key component to this analysis involves various "failure scenarios," which analyze the airflow performance during different air distribution unit (AHUs, CRACs, etc.) failures. This ensures that adequate redundancy exists to meet the facility's operational risk requirements.

Depending on the layout of the air distribution units and the computer equipment load distribution, there may be varying effects on the system performance based upon which unit fails. One unit's failure may have a greater impact to the system than another.

Finally, the actual operational condition of each critical system and component should be evaluated through a Systems Operational Assessment. This step is employed to verify that the infrastructure can perform to rated design capacity. The evaluation should utilize various on-line condition assessment technologies, such as vibration analysis, IR scanning, tribology (lubricant analysis), motor analysis, laser alignment, and computerized balancing.

Some large facilities operations have the in-house capability to perform some or all of these on-line condition assessments. But for most sites, these technologies will be contracted out to service providers who specialize in predictive maintenance and operational condition assessment, along with their trained technicians necessary to perform and evaluate the data. All of these activities are performed in the field and will yield data on the spot. Even rudimentary field tests are possible for lubricants, though sophisticated laboratory tests may be required if the field tests identify problems. The Systems Operational Assessment should include a full evaluation of the operational parameters and control set points to ensure negative outcomes such as CRAC "fighting" and unnecessary latent cooling (dehumidification) are avoided.

Obviously, the goal of this process is to eliminate the hot spots by fully optimizing the data center's existing infrastructure. However, if hot spots persist, then the results of the evaluation and analyses should provide valuable insight and direction regarding what facility and/or infrastructure modifications or upgrades will best serve the data center in the future. Any significant changes or modifications implemented should be followed by a re-commissioning effort to ensure the systems provide the performance expected.

Rate this Tip
To rate tips, you must be a member of SearchDataCenter.com.
Register now to start rating these tips. Log in if you are already a member.




BROWSE BY TAG
Data center design and infrastructure,   Data center cooling,   Data center standards and metrics,   Data center operations management,   Data Center Management Advisory Newsletter,   VIEW ALL TAGS

Digg This!    StumbleUpon Toolbar StumbleUpon    Bookmark with Delicious Del.icio.us   



RELATED CONTENT
Data center cooling
IT wish list: Better ways to analyze data center environmental metrics
End users still cool on Iceland as a data center site
Air-side economizers reduce energy use at NetApp data center
Sizing computer room air conditioners for data center energy efficiency
Should you comply with Article 645 of the National Electrical Code?
How to identify and remediate data center hot spots
Data center humidity levels source of debate
Air-side and water-side economizers in the data center
Amazon data center facility engineer touts radical cooling tactics
Colo taps cold weather, river for green data center
Data center cooling Research

Data center standards and metrics
IT wish list: Better ways to analyze data center environmental metrics
Buyout could boost Uptime Institute
IT pros weigh Gartner Magic Quadrant lawsuit
SPECpower benchmark has flaws, says analyst
Uptime Institute opens data center availability tiers
Healthcare data centers face deadline pressure
In measuring data center power use, more (info) is more
Apps testing key in upgrade to six-core processors
L.L. Bean data center earns silver LEED certification: News in brief
Group works toward energy-efficient high-performance computing

Data Center Management Advisory Newsletter
Data center outsourcing best practices and pitfalls to avoid
Data center pros must prepare for increased space weather
Data center consolidation strategy can benefit from ITIL lifecycle
Sizing computer room air conditioners for data center energy efficiency
Data center humidity levels source of debate
Where and how to build your next data center in a down economy
Avoid data center relocation failure: Top five pitfalls
Understanding green IT and data center energy-efficiency regulations
Preventing a data center power crisis
Using chargeback to reduce data center power consumption: Five steps

RELATED GLOSSARY TERMS
Terms from Whatis.com − the technology online dictionary
ambient temperature  (SearchDataCenter.com)
ASHRAE  (SearchDataCenter.com)
Calibrated Vectored Cooling  (SearchDataCenter.com)
compaction  (SearchDataCenter.com)
computer room air conditioning unit  (SearchDataCenter.com)
data center chiller  (SearchDataCenter.com)
green data center  (SearchDataCenter.com)
hot/cold aisle  (SearchDataCenter.com)
HVAC  (SearchDataCenter.com)
water cooling  (SearchDataCenter.com)

RELATED RESOURCES
2020software.com, trial software downloads for accounting software, ERP software, CRM software and business software systems
Search Bitpipe.com for the latest white papers and business webcasts
Whatis.com, the online computer dictionary

DISCLAIMER: Our Tips Exchange is a forum for you to share technical advice and expertise with your peers and to learn from other enterprise IT professionals. TechTarget provides the infrastructure to facilitate this sharing of information. However, we cannot guarantee the accuracy or validity of the material submitted. You agree that your use of the Ask The Expert services and your reliance on any questions, answers, information or other materials received through this Web site is at your own risk.



White Papers - Data Center Networking

The Intel IT Technology Center - Power, Performance and Mobility Solutions

HomeNewsTopicsITKnowledge ExchangeTipsBlogsMultimediaWhite PapersEvents
About Us  |  Contact Us  |  For Advertisers  |  For Business Partners  |  Site Index  |  RSS
SEARCH 
TechTarget provides technology professionals with the information they need to perform their jobs - from developing strategy, to making cost-effective purchase decisions and managing their organizations' technology projects - with its network of technology-specific websites, events and online magazines.

TechTarget Corporate Web Site  |  Media Kits  |  Site Map




All Rights Reserved, Copyright 2005 - 2009, TechTarget | Read our Privacy Policy
  TechTarget - The IT Media ROI Experts