Home > Data Center News > NEC to roll out new x86 fault-tolerant servers
Data Center News:
EMAIL THIS

NEC to roll out new x86 fault-tolerant servers

By Joe Spurr, News Writer
16 Feb 2006 | SearchDataCenter.com

IT infrastructure news
Digg This!    StumbleUpon Toolbar StumbleUpon    Bookmark with Delicious Del.icio.us    Add to Google

NEC Solutions (America) Inc. is releasing a new line of x86 fault-tolerant servers the company touts will sooth budget and management woes with their abilities to reduce downtime and recover from disaster.

The Rancho Cordova, Calif.,-based company recently announced the Express5800/320Ma will cost its network a total of five minutes of downtime per year, with a choice of either dual-core 2.8 GHz Intel Xeon processors or single-core chips of 3.2 or 3.6 GHz.
More fault-tolerant servers:

What's your downtime worth?

HP NonStop server targets smaller businesses

Fault-tolerant systems have twin components that mirror, or lockstep, each other, so if one fails, the other continues to work with no interruption.

Extreme reliability, traditionally associated with larger systems, such as mainframes, has increasingly moved into x86 systems in the last few years as they are being pushed further up the IT food chain.

The x86 servers are being used in circumstances that are completely different from what they were used for to begin with, according to Charles King, principal analyst with Hayward, Calif.,-based Pund-IT Research.

"People are deploying [x86 servers] for a variety of business-critical applications," King said. "Which brings up the issue that if you are going to be deploying a low-to-midrange solution for high-liability applications, how do you ensure that you can depend on this to keep things running?"

NEC said the fault tolerant system holds an advantage over clustering by saving on license fees and labor cost.

"That's the secret sauce," said Dick Csaplar, a product manager for NEC. "Even though we have four CPUs in the box, we only need one copy of Windows. And all of the hardware is swappable. If you lose a module, you literally just slide it out of the server, ship it to NEC and we ship it back."

And by putting the processor and I/O onto the same module, NEC has reduced the number of modules from four to two. Less modules means the systems are less complicated and easier to maintain, Csaplar said.

The Express5800/320Ma will also feature Active Upgrade support as an option, which lets users upgrade without having to reboot by modifying one while the other handles the workload, then swapping again afterward to 'wash the other hand.'

Additional server rollback capabilities aim to protect data regarding such functions as security patches and service packs.

Tentatively available in March/April for $30,000-$50,000, the new systems will support Microsoft's Windows Server 2003 and Red Hat Linux sometime midyear.

Let us know what you think about the story; e-mail: Joe Spurr, News Writer



Tags: Data center disaster recovery planningRack mount server and x86 hardwareVIEW ALL TAGS

Digg This!    StumbleUpon Toolbar StumbleUpon    Bookmark with Delicious Del.icio.us    Add to Google



RELATED CONTENT
Data center disaster recovery planning
Data center pros must prepare for increased space weather
Are you wasting disaster recovery budget to avoid employee inconvenience?
Four ways to extend data center UPS battery life
Why SunGard uses flywheel UPSes in its data centers
Lower disaster recovery costs with open source replication tools
Apple updates Xserve, Symantec ships DR monitoring software: News in brief
Data center disaster recovery planning
Google opts for battery backup over UPS: News in brief
Avoiding disaster recovery pitfalls in VMware and Linux: Rejecting default settings
Make IT change management part of your disaster recovery plan
Data center disaster recovery planning Research

Rack mount server and x86 hardware
Converging hardware consolidates IT purchase power
Are containerized data centers catching on outside Microsoft, Google?
Will Oracle hold a Sun yard sale as the acquisition's value declines?
HP's buyout of 3Com continues IT convergence push
Sun Microsystems customers stew in limbo
What are your CIO's priorities? An interview with Sunoco's CIO
Will Solaris on x86 survive the Oracle-Sun acquisition and Linux?
Reporter's notebook on AFCOM Data Center World: Day two
IT services consolidation: Data centers weigh risks
Users buying, configuring servers for virtualization

RELATED GLOSSARY TERMS
Terms from Whatis.com − the technology online dictionary
Business Continuity and Disaster Recovery (BCDR)  (SearchStorage.com)
high availability  (SearchDataCenter.com)
RAIN  (SearchDataCenter.com)
uninterruptible power supply  (SearchDataCenter.com)
Uptime Institute, Inc.  (SearchDataCenter.com)

RELATED RESOURCES
2020software.com, trial software downloads for accounting software, ERP software, CRM software and business software systems
Search Bitpipe.com for the latest white papers and business webcasts
Whatis.com, the online computer dictionary



Efficient Management for Data Centers
HomeNewsTopicsITKnowledge ExchangeTipsBlogsMultimediaWhite PapersEvents
About Us  |  Contact Us  |  For Advertisers  |  For Business Partners  |  Site Index  |  RSS
SEARCH 
TechTarget provides technology professionals with the information they need to perform their jobs - from developing strategy, to making cost-effective purchase decisions and managing their organizations' technology projects - with its network of technology-specific websites, events and online magazines.

TechTarget Corporate Web Site  |  Media Kits  |  Site Map




All Rights Reserved, Copyright 2005 - 2009, TechTarget | Read our Privacy Policy
  TechTarget - The IT Media ROI Experts